May-June 2016, Nuclear Plant Journal - page 16

16
NuclearPlantJournal.com Nuclear Plant Journal, May-June 2016
New
Documents
IAEA
Preparedness and Response for a
Nuclear or Radiological Emergency,
IAEA, Austria, November 2015, STI/
PUB/1708.
This publication establishes the
requirements for an adequate level
of preparedness and response for a
nuclear or radiological emergency. The
application of these requirements is also
intended to mitigate the consequences
of a nuclear or radiological emergency
if such an emergency arises despite all
efforts made to prevent it. The fulfilment
of these requirements will contribute
to the harmonization worldwide of
arrangements for preparedness and
response for a nuclear or radiological
emergency. The requirements are
also intended for use by response
organizations, operating organizations
and the regulatory body in respect of
preparedness and response for a nuclear
or radiological emergency, as well as
by authorities with responsibilities for
emergency preparedness and response at
the local and regional level .
NIST
Guidance on Robot Operator
Certification
. By Tim Brooke, ASTM
International.
ASTM International, along with a
number of other standards organizations,
has developed a series of voluntary
standards to evaluate the performance
of robots and, in turn, their operators.
These standards are the result of the
collaboration of experts fromgovernment,
industry and academia. And now there is
an opportunity to formalize the evaluation
of robot operators by assessing their
abilities through a personnel certification
program. The intent of the programwould
be to provide an independent, third-party
verification that the operator possesses
certain knowledge, skills, and abilities
related to robot technologies.
NRC Documents
NUREGs
1.
NUREG 2180, “Area-Wide VEWFD
Event Tree Non-Suppression Probability
Calculator.”
Accession
Number
ML16096a434, April, 2016.
2.
NUREG-2178, “Volume 1, Appendix E,
Obstructed Plume Fire Modeling Results.”
Accession Number ML16117A300, April,
2016.
3.
NUREG/BR-0508, Rev. 1, “Reactor
Oversight Process.”
Accession Number
ML16119A045, April, 2016.
4.
NUREG/CR-6827, “Assessment of
Internal Oxidation (IO) as a Mechanism
for Submodes of Stress Corrosion Cracking
(SCC) That Occur on the Secondary Side
of Steam Generators.”
Accession Number
ML063060278, May 2016.
5.
NUREG-1921 Supplement 1, “EPRI/
NRC-RES Fire Human Reliability Analysis
Guidelines: Qualitative Guidance for Main
Control Room Abandonment Scenarios.”
Draft
Report.
Accession
Number
ML16110A413, April, 2016.
6.
NUREG/CR-7214, “Toward a More
Risk-Informed and Performance-Based
Framework for the Regulation of the
Seismic Safety of Nuclear Power Plants.”
Accession Number ML16126A008, May,
2016.
7.
NUREG/KM-0009, “Historical Review
and Observations of Defense-in-Depth.”
Accession Number ML16104A071, April,
2016.
8.
NUREG/CR-7215, “Spent Fuel
Pool Project Phase 1: Pre-Ignition and
Ignition Testing of a Single Commercial
17x17 Pressurized Water Reactor Spent
Fuel Assembly Under Complete Loss of
Coolant Accident Conditions.”
Accession
Number ML16112A022, April, 2016.
9.
NUREG-0713, Vol. 36, “Occupational
RadiationExposureatCommercialNuclear
Power Reactors and Other Facilities 2014
Forty-Seventh Annual Report.”
Accession
Number ML16112A230, April, 2016.
10.
NUREG-1824, “Supplement 1,
Appendix B Consolidated Fire and Smoke
Transport (CFAST).”
Accession Number
ML16132A547, May, 2016.
11.
NUREG-2178, Vol.1, “Refining
And Characterizing Heat Release Rates
From Electrical Enclosures During Fire
(RACHELLE-FIRE) Volume 1: Peak Heat
Release Rates and Effect of Obstructed
Plume, Volume 1: Peak Heat Release
Rates and Effect of Obstructed Plume.”
Accession Number
ML16110A140,
April, 2016.
12.
NUREG/CR-7216, “Spent Fuel
Pool Project Phase II: Pre-Ignition and
Ignition Testing of a 1x4 Commercial
17x17 Pressurized Water Reactor Spent
Fuel Assemblies Under Complete Loss of
Coolant Accident Conditions.”
Accession
Number ML16112A084, April, 2016.
13.
NUREG-2179,Volume2, “Environmental
Impact Statement for the Combined License
(COL) for the Bell Bend Nuclear Power Plant
Final Report, Chapters 9 to 12 and Appendices
A to N.”
Accession Number ML16111B193,
April, 2016.
14.
NUREG-0094 Rev 1 of WASH 1094,
“A Guide for the Licensing of Facility
Operators, Including Senior Operators.”
Accession Number ML16123A137, May,
2016.
15.
NUREG-0779, “Final Environmental
Statement related to the Operation of
Waterford Steam Electric Station, Unit
3.”
Accession Number ML16095A114,
April, 2016.
16.
NUREG-2184 Final Report “Supplement
to the U.S. Department of Energy’s
Environmental Impact Statement for a
Geologic Repository for the Disposal of Spent
Nuclear Fuel and High-Level Radioactive
Waste at Yucca Mountain, Nye County,
Nevada”
Accession Number ML16125A032,
May 2016.
The above NRC documents can be
found in the NRC Public Document Room,
1...,6,7,8,9,10,11,12,13,14,15 17,18,19,20,21,22,23,24,25,26,...52
Powered by FlippingBook