ND14.indd - page 84

84
Product & Service Directory–2015
Joseph Oat Corporation • Kinectrics Incorporated
Consulting: Steam Generators
Consulting: Thermal Analysis
Consulting: Tube Plugging
Containers: Disposal
Containers: Radwaste
Containers: Radwaste
Containers: Shielded
Containers: Steel
Containers: Storage
Containers: Transport
Containers: Waste
Contract Engineering Services
Coolers: Containment
Coolers: Drywell
Cryogenic Storage Tanks
Dampeners: Pulsation
Design Services
Design: Mechanical
Design: Seismic
Engineering Services
Engineering: Design
Engineering: Materials
Engineering: Mechanical
Engineering: Nuclear
Equipment Design
Equipment: Safety-Related
Evaporators
Fabrication: Tubular Products
Fabrications
Fasteners
Feedwater Heaters
Filters
Filters: ASME Code
Filters: Duplex
Filters: Metal Mesh
Filters: Ultra
Fittings
Fittings: Welding
Flanges
Flanges: Vacuum
Flowmeters
Fuel Pool Auxilary Cooling
Fuel Pool Cleanup
Fuel Pool Equipment
Glove Boxes
Heat Exchanger Analysis/Inspection
Services
Heat Exchangers
Heat Exchangers: Rebuilding
Heat Exchangers: Shell
Heat Exchangers: Studies
Heat Exchangers: Tubes
Heat Tracing Systems
Machining: Heat Exchanger
Machining: Safety-Related
Manufacturing Services
Material: ASME Code
Material: ASME Code
Material: Inconel 600 Series
Metal Fabrication
Metal Fabrication: Nickel & Nickel Alloy
Metal Fabrication: Stainless Steel
Metal Fabrication: Steel
Metal Fabrication: Titanium
Metal Facing
Metal: Alloy
Metal: Alloy Bar
Metal: Alloy Plate
Metal: High-Temperature
Metallizing
Meters: Safety-Related
Models: Heat Exchanger
Nickel
NPT Stamp Holder
Parts: O.E.M.
Parts: Replacement
Parts: Replacement, Design
Parts: Spare
Pipe
Pipe Assemblies
Pipe Benders
Pipe Bending
Pipe Bends
Pipe Fabrication
Pipe Fabrication: Class 1
Pipe Fabrication: Class 2
Pipe Fabrication: Class 3
Pipe Fittings
Pipe Fittings: Flanged-Weldneck-Slip On
Pipe Fittings: High-Alloy Steel
Pipe Fittings: Low-Alloy Steel
Pipe Fittings: Miscellaneous Metal
Pipe Fittings: Tee’s
Pipe: Alloy
Pipe: Copper Alloy
Pipe: High-Alloy Steel
Pipe: Low-Alloy
Pipe: Stainless Steel
Pipe: Titanium
Pipe: Zirconium
Piping Replacement
Plugs
Plugs: Condenser
Plugs: Feedwater Heater
Pressure Vessel Analysis
Pressure Vessels
Primary-Side Piping
Racks: Storage
Radwaste Tanks
Safety Equipment
Seismic Analysis
Shielding
Steam/Water Separators
Steel Components
Steel: Boron Containing
Steel: Carbon
Steel: Stainless
Storage: Spent Fuel
Tank Heating Products
Tanks: Chemical
Tanks: Ion Exchange
Tanks: Pressure
Tanks: Stainless Steel
Tanks: Storage
Titanium
Tube Benders
Tube Bundle Components
Tube Expansion
Tube: Copper
Tube: Copper Alloy
Tubing
Tubing: Alloy
Tubing: Stainless Steel
Tubing: Stainless Steel
Tubing: Titanium
Tubing: Zirconium
UltraFiltration
Vacuum Chambers
Vessel Fabrication
Weld Repair
Welding
Welding: ASME Code
Zirconium
Kinectrics Incorporated,
800 Kipling Avenue, Unit 2, Toronto,
Ontario, M8Z 5G5 Canada; Phone: (416)
207-6000, Fax: (416) 207-6532, Http://
t:
Cheryl Tasker-Shaw.
Aging Management
Air-Operated Valve Diagnostics
Analysis: Chemical
Analysis: Environmental
Analysis: Polymer
Analysis: Risk
Analysis: Severe Accident
Assessment: Plant Condition
Chemistry Services
Commercial-Grade Dedication
Consulting: Chemistry
Consulting: Decommissioning
Consulting: Engineering
Consulting: Environmental
Consulting: Health Physics
Consulting: Human Factors Engineering
Consulting: Life Cycle Management
Consulting: LOCA Analysis
Consulting: Materials Analysis
Consulting: Metallurgical Analysis
Consulting: Radiochemistry
Consulting: Regulatory Compliance
Consulting: Seismic
Consulting: Third Party Review
Consulting: Training
Consulting: Waste Management
Corrosion Testing Laboratory
Decontamination Services
Dosimetry Services
Engineering Services
Environmental Qualification
Equipment Qualification
Life Extension: Plant
Materials Characterization
MOV Motors: Safety-Related Testing
NDE Services
Outage Support Services
Parts Evaluation
Parts: Replacement
Parts: Replacement, Design
PCB Removal
Probabilistic Risk Assessment
Radiochemistry
Seismic Analysis
Testing: Chemical
Testing: Electrical
Testing: LOCA Conditions
1...,74,75,76,77,78,79,80,81,82,83 85,86,87,88,89,90,91,92,93,94,...104
Powered by FlippingBook